Chambishi Copper Mine in Zambia
DATE:15 Nov 2017 瀏覽次數(shù):1
+ . -

The project is in Copperbelt Province in the north of Zambia, and copper sources are mainly the main orebody, west orebody and southeast orebody. It went into production on July 28, 2003 (including graded tailings filling system). The west orebody has went into production at the end of 2012 (including paste filling system).

The design capacity of the main ore body is 6,500 t/d. Medium-length hole sublevel open stoping with backfilling and upward horizontal cut-and-fill stoping method, shaft development and full-automatic hoisting system are adopted. 10m3 side-bottom dumping car independently designed by ENFI is used for level haulage. The design capacity of the west orebody is 3,000 t/d, point-pillar backfilling and upward horizontal cut-and-fill stoping method are used. Combined trackless ramp and central auxiliary shaft development is used.

The design capacity of the concentrator is 6,500 t/d. Three-stage crushing with one closed circuit process, one-stage roughing, two-stage scavenging, one-stage cleaning and middlings regrinding process, and two-stage dewatering of thickening - filtering for copper concentrate are adopted.

磐安县| 水富县| 辽宁省| 凤凰县| 柳林县| 巴林右旗| 忻州市| 五台县| 固原市| 岐山县| 临武县| 漳州市| 延川县| 武胜县| 鄂托克旗| 增城市| 东台市| 朝阳区| 禹州市| 锡林浩特市| 南投市| 福安市| 盐亭县| 九江县| 玛纳斯县| 于都县| 新丰县| 酒泉市| 彩票| 驻马店市| 宁河县| 阿拉善右旗| 雅江县| 普安县| 高碑店市| 土默特右旗| 桑日县| 宁陕县| 太仓市| 天台县| 丰县|