Chambishi Copper Mine in Zambia
DATE:15 Nov 2017 瀏覽次數(shù):1
+ . -

The project is in Copperbelt Province in the north of Zambia, and copper sources are mainly the main orebody, west orebody and southeast orebody. It went into production on July 28, 2003 (including graded tailings filling system). The west orebody has went into production at the end of 2012 (including paste filling system).

The design capacity of the main ore body is 6,500 t/d. Medium-length hole sublevel open stoping with backfilling and upward horizontal cut-and-fill stoping method, shaft development and full-automatic hoisting system are adopted. 10m3 side-bottom dumping car independently designed by ENFI is used for level haulage. The design capacity of the west orebody is 3,000 t/d, point-pillar backfilling and upward horizontal cut-and-fill stoping method are used. Combined trackless ramp and central auxiliary shaft development is used.

The design capacity of the concentrator is 6,500 t/d. Three-stage crushing with one closed circuit process, one-stage roughing, two-stage scavenging, one-stage cleaning and middlings regrinding process, and two-stage dewatering of thickening - filtering for copper concentrate are adopted.

贵定县| 万山特区| 许昌市| 清镇市| 龙山县| 信丰县| 康乐县| 奉贤区| 内江市| 滦南县| 丰都县| 辽宁省| 广汉市| 洱源县| 孟津县| 新源县| 关岭| 凉山| 弋阳县| 晋中市| 通州区| 农安县| 顺昌县| 中西区| 安徽省| 双流县| 八宿县| 莫力| 台安县| 莲花县| 赫章县| 克什克腾旗| 庄浪县| 且末县| 灵寿县| 宜昌市| 祁阳县| 古丈县| 东安县| 钟祥市| 驻马店市|